현성엔지니어링(주)

Skip to content Skip to main menu

Business

Business

Project list
Region Client Contractor Project name Scope of work Year of completion
Domestic Korea Southern Power GE VERNOVA Shin-Sejong Defect Repair Works Emergency GT E&I Works, Piping Modification (Firefighting & Water Washing), and GT Alignment Dec. 2025
Domestic Korea Southern Power GE VERNOVA Shin-Sejong Bitdream GT Maintenance Works Installation of 88BT Motor, GT Inlet cone Bolt, GT Load Coupling Runout Check Jan. 2025
Domestic Naepo Green Energy LOTTE E&C Naepo Green Energy PCV 1024 Weld Crack Repair Work Repair Works
Domestic SK Innovation Narae Energy Service YS INNOTECH Wirye SCR Seal Plate Removal & Reinstallation Work SCR Seal Plate Replacement Works May. 2025
Domestic Naepo Green Energy LOTTE E&C Naepo CHP GT Diffuser Liner Damage Repair Work Repair Works
Domestic Korea Western Power Korea Power Engineering Taean Unit 10 Coal Pulverizer Feeder (#A–F) Overhaul Maintenance Maintenance Works Jan. 2025
Domestic Korea Western Power KEPCO KPS Gunsan Office Gunsan HRSG Air Duct Expansion Joint Replacement Work Replacement Works Jan. 2025
Domestic Korea Western Power KEPCO KPS, Taean Plant Unit 9 Boiler Damper & Electrostatic Precipitator Maintenance Maintenance Works Aug. 2024
Domestic Korea Southern Power GE VERNOVA Design and fabrication of fuel gas separator platform at Shin Sejong Fabrication & Installation Works Aug. 2024
Domestic Korea Southern Power GE VERNOVA Supply of manpower for warranty work at Shin Sejong Support Works Jul. 2024
  • [Domestic] Shin-Sejong Defect Repair Works
    Client: Korea Southern Power Contractor: GE VERNOVA
    Scope of work: Emergency GT E&I Works, Piping Modification (Firefighting & Water Washing), and GT Alignment Year of completion: Dec. 2025
  • [Domestic] Shin-Sejong Bitdream GT Maintenance Works
    Client: Korea Southern Power Contractor: GE VERNOVA
    Scope of work: Installation of 88BT Motor, GT Inlet cone Bolt, GT Load Coupling Runout Check Year of completion: Jan. 2025
  • [Domestic] Naepo Green Energy PCV 1024 Weld Crack Repair Work
    Client: Naepo Green Energy Contractor: LOTTE E&C
    Scope of work: Repair Works Year of completion:
  • [Domestic] Wirye SCR Seal Plate Removal & Reinstallation Work
    Client: SK Innovation Narae Energy Service Contractor: YS INNOTECH
    Scope of work: SCR Seal Plate Replacement Works Year of completion: May. 2025
  • [Domestic] Naepo CHP GT Diffuser Liner Damage Repair Work
    Client: Naepo Green Energy Contractor: LOTTE E&C
    Scope of work: Repair Works Year of completion:
  • [Domestic] Taean Unit 10 Coal Pulverizer Feeder (#A–F) Overhaul Maintenance
    Client: Korea Western Power Contractor: Korea Power Engineering
    Scope of work: Maintenance Works Year of completion: Jan. 2025
  • [Domestic] Gunsan HRSG Air Duct Expansion Joint Replacement Work
    Client: Korea Western Power Contractor: KEPCO KPS Gunsan Office
    Scope of work: Replacement Works Year of completion: Jan. 2025
  • [Domestic] Unit 9 Boiler Damper & Electrostatic Precipitator Maintenance
    Client: Korea Western Power Contractor: KEPCO KPS, Taean Plant
    Scope of work: Maintenance Works Year of completion: Aug. 2024
  • [Domestic] Design and fabrication of fuel gas separator platform at Shin Sejong
    Client: Korea Southern Power Contractor: GE VERNOVA
    Scope of work: Fabrication & Installation Works Year of completion: Aug. 2024
  • [Domestic] Supply of manpower for warranty work at Shin Sejong
    Client: Korea Southern Power Contractor: GE VERNOVA
    Scope of work: Support Works Year of completion: Jul. 2024